1 750
2b 350

Scope
• Sewer Master Plan
• Assessment of sewerage flows
• Flow logging
• CCTV camera inspections
• Surveying of invert levels and pipe sizes
• Hydraulic analysis

System
• 2x Waste water treatment works (2-4 Ml/d)
• 5x pumping stations
• 70km of sewers
• 1084 manholes

3a 350 3b 350